UXL

A positioning practice for specialist CROsClinicalBioanalyticalSpecialty

What you get

One thing is for sale

Everything else unlocks only if the work says you need it. Most of the time, it doesn't.

Positioning Sprint for Specialist CROs

Four weeks · fixed scope · one at a time

€10,000

Pilot

We're running a pilot through 2026. Early clients pay €6,500, in exchange for a detailed case study.Half at kickoff, half after week one. If week one doesn't earn the rest, you stop there and keep it.

  • Message Architecture DocumentThe positioning decision, written down. Twelve to eighteen pages, yours to edit.
  • Competitive Alternatives MapThe CROs, internal options and status quo the sponsor weighs for this kind of programme.
  • Capabilities deck structure and production-ready copyNot a direction to interpret. The story and the words, in order.
  • BD Meeting BriefThe decision logic, proof and questions your team opens before a sponsor meeting.
  • AI Context PackPositioning, voice and proof in a format your team uses to keep proposals and RFP responses on message.
  • Implementation Readiness AssessmentScored across five execution surfaces. It decides what happens next.
  • Three 60-minute working sessionsPlus a 45-minute handoff with whoever has to use the work.

For scale: a Head of Marketing is €80–150k a year, plus four to six months of ramp.

Week by week

Exactly what the four weeks look like

Three hours of your time in total, spread across three sessions. Everything else happens without you in a meeting.

Before we start

Your side

One kickoff questionnaire, then the evidence you already have: RFP debriefs, winning and lost proposals, capabilities decks, sponsor feedback and recordings of BD calls. Before you sign, we tell you how much of the work that evidence can carry.

No sponsor interviews inside the critical path. Nothing waits on someone else’s calendar.

Our side

We read your homepage and public capabilities material against three direct alternatives, then trace where your strongest scientific and delivery proof appears across the sponsor decision path.

We arrive at the first session having already read the evidence.

Week 01

Decision context

60 min of your time

Mon

Working session 1

60 min

How the sponsor team frames the programme, which risks each stakeholder carries and what proof moves the shortlist.

Tue

Evidence synthesis

We read RFP debriefs, proposals, capabilities decks, sponsor feedback and BD calls line by line. Their decision language, not ours.

Wed

Competitive Alternatives Map

Three direct CRO alternatives, the internal option and the cost of leaving the programme as it is.

Thu

Three to five positions

Each written as it would open your capabilities deck, ranked by risk, with the evidence behind it.

Fri

Our recommendation

Loom ~10 min

Which position we would take, and why. In the pilot, this is the checkpoint: continue, or stop and keep it.

Week 02

The filter

60 min of your time

Mon

Working session 2

60 min

The Science-to-Signal Filter. Capability table stakes get cut, out loud, with you in the room.

Tue

The copy-paste test

Every surviving claim gets a competitor’s name pasted into it. If it still reads true, it dies.

Wed

Objection architecture

The scientific, delivery and risk objections sponsors actually raise, and the proof for each.

Thu

Positioning drafted

The decision written as a sentence, before it is written as a document.

Fri

Loom

~10 min

What survived the filter, and what we killed. Including the capabilities you liked.

Week 03

The architecture

60 min of your time

Mon

Working session 3

60 min

You choose one position. We write down which sponsors and programmes it prioritises and what you give up to hold it.

Tue

Message Architecture Document

Twelve to eighteen pages. The decision, the reasoning, the proof and the language.

Wed

Capabilities deck structure and copy

The sponsor story and the words, in order, ready for design and production.

Thu

Readiness scoring begins

We score your five execution surfaces. If something is failing, you hear it this week.

Fri

Loom

~10 min

Where the scoring is heading, before it is final.

Week 04

Handoff

45 min of your time

Mon

BD Meeting Brief

The sponsor decision, proof and questions your team opens before a meeting.

Tue

AI Context Pack

Positioning, voice and proof in a format your team uses for proposals and RFP responses.

Wed

Implementation Readiness Assessment

Five sponsor-facing surfaces, scored one to five each. Out of twenty-five. You see the sheet.

Thu

Handoff

45 min

The document, deck structure, assessment and what happens next. Bring whoever owns BD and scientific review.

Fri

Delivered

If the assessment came back red, the Messaging Implementation Blueprint is in the package at no extra cost.

Sponsor interviews are a separate module. They never run inside the four weeks, because the sprint never waits on someone else’s calendar.

Week four

The assessment decides. Not us.

Every surface that carries your message gets a number out of five.

  • Capabilities deck
  • RFP / proposal
  • Website
  • Conference / outbound
  • BD alignment

You see the sheet. Not a summary of it.

Sometimes the answer is that you need nothing else from us.

Each column is one surface: capabilities deck, RFP/proposal, website, conference/outbound and BD alignment.

What the assessment can unlock

Implementation Sprint

Requires Positioning Sprint · Readiness below ready

Puts the message onto the surfaces you already have. Modular — one module per surface that scored low, so you only pay for what failed. Two to three weeks.

€4,000–8,000

Commercial Surface

Requires Positioning Sprint · Website surface below ready

The site that implements the positioning. Design and build, not a rewrite of the one you have. It is the only execution we take on, always downstream of a positioning decision we made with you.

For scale: a full-service agency rebuild runs €30–80k over three to six months, without life sciences expertise.

€18,000–25,000

Sponsor Evidence Module

Add-on · no assessment needed

Three sponsor interviews we run and synthesise. The sprint itself runs on evidence you already have — RFP debriefs, proposals, capabilities decks, sponsor feedback and BD calls — so this is an addition, never a dependency. It runs alongside or after; the sprint never waits on it.

€2,000

Messaging Ops

Requires Positioning Sprint · minimum three months

Two calls a month, review of new sponsor-facing assets before they ship, a quarterly update of the Message Architecture Document, and the AI Context Pack kept current as capabilities, indications and competitors change.

€1,500/month

What we don't do

No retainer without a sprint. Maintaining a message that was never decided is just maintenance of the problem.

No website or deck redesign without the positioning in front of it. A surface that looks better and says the same thing is an expensive way to stay interchangeable.

No promised numbers. Positioning moves over quarters, and anyone selling you an attributable percentage in ninety days is selling attribution, not positioning.

No campaigns, no content factory, no fractional CMO. Adjacent work, different business.

What we guarantee

If any deliverable doesn't meet the standards we define at kickoff, we revise it until it does.

And if you implement the messaging for ninety days and see no measurable improvement in how sponsors engage, we run an additional optimisation sprint at no cost.

Payment is split 50% at kickoff, 50% on delivery. During the pilot, the second half is due after week one — and you can stop there.

Before you ask

Six questions, answered first

We win through relationships. Why does positioning matter?

Relationships earn access and trust. Positioning makes that advantage travel when the sponsor meets the rest of the team, compares the capabilities deck, circulates the proposal or has to defend a shortlist internally. The sprint gives every person and surface the same clear reason to choose you.

Every study is different. Can one position cover all of them?

The position does not replace programme-specific thinking. It establishes the pattern: which sponsors and programmes you are unusually well suited for, which operating choices make that true and which evidence reduces risk. The proposal still adapts to the study; the reason to trust you stops changing from pursuit to pursuit.

Do you interview sponsors?

Not inside the four weeks. The sprint runs on the evidence you already have — RFP debriefs, winning and lost proposals, capabilities decks, sponsor feedback and BD calls — agreed before you sign. If you want fresh sponsor interviews, the Sponsor Evidence Module runs alongside or after, without putting the sprint on someone else’s calendar.

What exactly do you deliver for the capabilities deck?

The complete narrative structure and production-ready copy: the sponsor problem, fit, scientific and delivery evidence, risk reduction, service detail and next step, in order. Visual design and slide production are outside the sprint. Your team or agency can build from the finished structure without interpreting a strategy deck.

Can we use AI to write proposals and RFP responses?

Yes, once the decision is clear. The AI Context Pack gives your team the approved positioning, voice, proof and boundaries in a reusable format for ChatGPT or Claude. AI can then accelerate a programme-specific response without quietly inventing a new “why us” every time.

Who actually does the work?

One person, one sprint at a time. There is no team to hand you off to and no junior doing the first draft.

The capabilities teardown

Thirty minutes,
one deck

Bring your capabilities deck. We’ll read it as a sponsor would: for fit, proof, delivery risk and a reason to choose you over the alternatives.

  • 30minutes, not an hour
  • 1capabilities deck, read like a sponsor
  • 3competitors, read beside it

You’ll leave with something useful whether or not we work together.